Items in basket £0.00  CHECKOUT

4C42 LBSCR 54ft 9 COMPT THIRD

Product Code: 4C042
4C42 LBSCR 54ft 9 COMPT THIRD

Etched brass kit. LBSCR Diagram198/171 SR Diagram 71/72 The nine compartment thirds were of three types, Diagram 171 were 1910 rebuilds, Diagram 198 were all new in two batches 1910 - 1913 and 1921. Another seven were built from brake thirds in 1936 / 37 for the Isle of Wight. Between 1942 and 25 a few were paired with push-pull coaches, otherwise none went into sets. In 1925 / 26 all the Diagram 171 / 198 coaches were modified for use as 2 car trailer sets to run between 3 SUB electric units. The electric trailers were withdrawn in 1947 / 48, except for some that became de-icing trailers and were withdrawn in 1961 / 62. The Isle of Wight rebuilds lasted till 1966 at the end of steam and No 2416 is preserved at Haven Street. Now supplied with our all metal bogies.

Product Options

Quantity :
add to basket :